- This event has passed.
1480/2015
June 20, 2015 @ 6:00 am - 12:30 pm UTC+5.5
In the matter of devising a mechanism for recovery of compensatory charges from entity (ies) who are in deviation to schedule and for whom a generating station of any entity is scheduled by State Load Dispatch Centre to ensure over drawl/under drawl at regional periphery as stipulated by Central Commission.