Hearing Schedule

Hearing Schedule

Sr.No. Date & Time Case No. Petitioner Respondent Subject Matter Previous Hearing Date & Time
1 22/02/2024 11:30 am 2074/2022
Pasithea Infrastructure Limited (Dudhava Project)
Pasithea Infrastructure Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for  declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
2 22/02/2024 11:30 am 2075/2022
Pasithea Infrastructure Limited (Khimana Project)
Pasithea Infrastructure Limited (Khimana Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
3 22/02/2024 11:30 am 2076/2022
Pasithea Infrastructure Limited (Khoda Project)
Pasithea Infrastructure Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
4 22/02/2024 11:30 am 2077/2022
Pasithea Infrastructure Limited (Rantila Project)
Pasithea Infrastructure Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
5 22/02/2024 11:30 am 2078/2022
Pasithea Infrastructure Limited (Voda Project)
Pasithea Infrastructure Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
6 22/02/2024 11:30 am 2079/2022
Vector Green New Energies Pvt. Limited (Khimat Project)
Vector Green New Energies Pvt. Limited (Khimat Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
7 22/02/2024 11:30 am 2080/2022
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for  declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
8 22/02/2024 11:30 am 2081/2022
Vector Green New Energies Pvt. Limited (Piluda Project)
Vector Green New Energies Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
9 22/02/2024 11:30 am 2082/2022
Vector Green New Solar Pvt. Limited (Khimat Project)
Vector Green New Solar Pvt. Limited (Khimat Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
10 22/02/2024 11:30 am 2083/2022
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
11 22/02/2024 11:30 am 2084/2022
Vector Green New Solar Pvt. Limited (Piluda Project)
Vector Green New Solar Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021
__
12 22/02/2024 11:30 am 2085/2022
Vector Green Sunrise Limited (Dudhava Project)
Vector Green Sunrise Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
13 22/02/2024 11:30 am 2086/2022
Vector Green Sunrise Limited (Khimana Project)
Vector Green Sunrise Limited (Khimana Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
14 22/02/2024 11:30 am 2087/2022
Vector Green Sunrise Limited (Khoda Project)
Vector Green Sunrise Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
15 22/02/2024 11:30 am 2088/2022
Vector Green Sunrise Limited (Rantila Project)
Vector Green Sunrise Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021.
__
16 22/02/2024 11:30 am 2089/2022
Vector Green Sunrise Limited (Voda Project)
Vector Green Sunrise Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2
In the matter of Petition under Section 86 (1) (b), (e), (f), (k) and Section 86 (4) of the Electricity Act, 2003 read with Regulations 80, 81, 82 and 84 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder read with Clauses 21 & 22 of the Policy for development of Small Scale Distributed Solar Projects, 2019 for declaration/approval of Change in law events and consequential recovery of impact on account of due to increase in rate of GST on solar modules and other solar power generator equipments vide Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021
__
17 22/02/2024 11:30 am 2143/2022 & allied IAs
Astonfiled Solar (Gujarat) Pvt. Limited
Astonfiled Solar (Gujarat) Pvt. Limited
GUVNL
GUVNL
In the matter of Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Clause 10 of the PPA
In the matter of Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Clause 10 of the PPA dated 30.04.2010 and amended PPA dated 07.08.2010 for adjudication of dispute between the Petitioner and the Respondent regarding Solar power generation at its fullest installed capacity of 11.5 MW as per the terms of the PPA by repairing solar power plant to achieve full potential utilization.
__
18 22/02/2024 11:30 am 2291/2023
Pasithea Infrastructure Limited (Dudhava Project)
Pasithea Infrastructure Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.
__
19 22/02/2024 11:30 am 2292/2023 
Pasithea Infrastructure Limited (Khimana Project)
Pasithea Infrastructure Limited (Khimana Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.
__
20 22/02/2024 11:30 am 2293/2023
Pasithea Infrastructure Limited (Khoda Project)
Pasithea Infrastructure Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.    
__
21 22/02/2024 11:30 am 2294/2023
Pasithea Infrastructure Limited (Rantila Project)
Pasithea Infrastructure Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.      
__
22 22/02/2024 11:30 am 2295/2023
Pasithea Infrastructure Limited (Voda Project)
Pasithea Infrastructure Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.        
__
23 22/02/2024 11:30 am 2296/2023
Vector Green New Energies Pvt. Limited (Khimat Project)
Vector Green New Energies Pvt. Limited (Khimat Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.          
__
24 22/02/2024 11:30 am 2297/2023
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.
__
25 22/02/2024 11:30 am 2298/2023
Vector Green New Energies Pvt. Limited (Piluda Project)
Vector Green New Energies Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.    
__
26 22/02/2024 11:30 am 2299/2023
Vector Green New Solar Pvt. Limited (Khimat Project) 
Vector Green New Solar Pvt. Limited (Khimat Project) 
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.      
__
27 22/02/2024 11:30 am 2300/2023
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.          
__
28 22/02/2024 11:30 am 2301/2023
Vector Green New Solar Pvt. Limited (Piluda Project)
Vector Green New Solar Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.          
__
29 22/02/2024 11:30 am 2302/2023
Vector Green Sunrise Limited (Dudhava Project)
Vector Green Sunrise Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.    
__
30 22/02/2024 11:30 am 2303/2023
Vector Green Sunrise Limited (Khimana Project)
Vector Green Sunrise Limited (Khimana Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.      
__
31 22/02/2024 11:30 am 2304/2023
Vector Green Sunrise Limited (Khoda Project)
Vector Green Sunrise Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.        
__
32 22/02/2024 11:30 am 2305/2023
Vector Green Sunrise Limited (Rantila Project)
Vector Green Sunrise Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.      
__
33 22/02/2024 11:30 am 2306/2023
Vector Green Sunrise Limited (Voda Project)
Vector Green Sunrise Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulat
In the matter of Petition under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Regulations 23, 80, 81 and 82 of the GERC (Conduct of Business) Regulations, 2004 amendments thereunder, read with Article 3.3, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date (SCOD) on certain change in circumstances and other events for total 16 PPAs of 4 MW each totaling to 64 MW.        
__
34 22/02/2024 11:30 am R.P. No. 01/2023
Pasithea Infrastructure Limited (Dudhava Project)
Pasithea Infrastructure Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
35 22/02/2024 11:30 am R.P. No. 02/2023
Pasithea Infrastructure Limited (Khimna Project)
Pasithea Infrastructure Limited (Khimna Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.      
__
36 22/02/2024 11:30 am R.P. No. 03/2023
Pasithea Infrastructure Limited (Khoda Project)
Pasithea Infrastructure Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
37 22/02/2024 11:30 am R.P. No. 04/2023
Pasithea Infrastructure Limited (Rantila Project)
Pasithea Infrastructure Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.    
__
38 22/02/2024 11:30 am R.P. No. 05/2023
Pasithea Infrastructure Limited (Voda Project)
Pasithea Infrastructure Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
39 22/02/2024 11:30 am R.P. No. 06/2023
Vector Green New Energies Pvt. Limited (Khimat Project) 
Vector Green New Energies Pvt. Limited (Khimat Project) 
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
40 22/02/2024 11:30 am R.P. No. 07/2023
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
Vector Green New Energies Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
41 22/02/2024 11:30 am R.P. No. 08/2023 
Vector Green New Energies Pvt. Limited (Piluda Project)
Vector Green New Energies Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
42 22/02/2024 11:30 am R.P. No. 09/2023
Vector Green New Solar Pvt. Limited (Khimat Project)
Vector Green New Solar Pvt. Limited (Khimat Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
43 22/02/2024 11:30 am R.P. No. 10/2023
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
Vector Green New Solar Pvt. Limited (Mithipaladi Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
44 22/02/2024 11:30 am R.P. No. 11/2023
Vector Green New Solar Pvt. Limited (Piluda Project)
Vector Green New Solar Pvt. Limited (Piluda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
45 22/02/2024 11:30 am R.P. No. 12/2023
Vector Green Sunrise Limited (Dudhava Project)
Vector Green Sunrise Limited (Dudhava Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
46 22/02/2024 11:30 am R.P. No. 13/2023 
Vector Green Sunrise Limited (Khimana Project)
Vector Green Sunrise Limited (Khimana Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
47 22/02/2024 11:30 am R.P. No. 14/2023
Vector Green Sunrise Limited (Khoda Project)
Vector Green Sunrise Limited (Khoda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.  
__
48 22/02/2024 11:30 am R.P. No. 15/2023 
Vector Green Sunrise Limited (Rantila Project)
Vector Green Sunrise Limited (Rantila Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.    
__
49 22/02/2024 11:30 am R.P. No. 16/2023
Vector Green Sunrise Limited (Voda Project)
Vector Green Sunrise Limited (Voda Project)
UGVCL & GUVNL
UGVCL & GUVNL
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004
In the matter of Review Petitions under Regulations 72 (1) of the GERC (Conduct of Business) Regulations, 2004 for reviewing the Order dated 10.10.2023 passed by the Commission in Petitions No. 2108 of 2023 to 2123 of 2023.    
__
50 22/02/2024 11:30 am 2125/2022
MUL
MUL
GUSSS & Others
GUSSS & Others
Petition/Application under Section 14, 15 and 18 of the EA, 03 read with Regulations 4 and 16 of GERC Distribu
Petition/Application under Section 14, 15 and 18 of the EA, 03 read with Regulations 4 and 16 of GERC Distribution License) Regulations, 2005 seeking alteration / modification /amendment of its existing distribution license by including within its license area the Mundra Taluka of Kutch District in the State of Gujarat.
__