Sr.No. Date & Time Case No. Petitioner Respondent Subject Matter Previous Hearing Date & Time
1 22/12/2023 11:30 am 2145 of 2023 & allied IAs
HPCL LNG Limited
HPCL LNG Limited
PGVCL & GETCO
PGVCL & GETCO
In the matter of Petition under Section 86 (1) (c), 86 (1), (i), 86 (1) (k), Section 40(a) and Section 42(1) o
In the matter of Petition under Section 86 (1) (c), 86 (1), (i), 86 (1) (k), Section 40(a) and Section 42(1) of the Electricity Act, 2003 read with Regulation 9 and 10 if the GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005 and Regulation 4.37 of the GERC (Electricity Supply Code and Related Matters) Regulations, 2015
__
2 22/12/2023 11:30 am 2191/2023
PGVCL & Others
PGVCL & Others
In the matter of Petition under Section 45, 46, 86 and other provisions of the Electricity Act, 2003 read wit
In the matter of Petition under Section 45, 46, 86 and other provisions of the Electricity Act, 2003 read with GERC (Licensee’s Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges) Regulations, 2005 for approval of levy of per KVA based charges from applicant  toward expenditure to be incurred by Distribution Licensee for development of underground electrical network for providing power supply at 11 KV/22 KV voltage level to new HT connection/additional demand.
__
3 22/12/2023 11:30 am 2199/2023
MPSEZ Utilities Limited
MPSEZ Utilities Limited
In the matter of Petition under Section 86 (1) (b) read with Section 63 of the Electricity Act, 2003 along wi
In the matter of Petition under Section 86 (1) (b) read with Section 63 of the Electricity Act, 2003 along with “Guidelines for Procurement of Power by the distribution licensees” issued by the Commission for seeking approval of the quantum and deviations from the Model Bidding documents as per the Ministry of Power’s Guidelines dated 06.03.2019 for Procurement of 2077 MW Power under Long-Term from Power Stations set up on Design, Build, Finance, Own and Operate (DBFOO).
__
4 22/12/2023 11:30 am 2206/2023
M/s Tata Power Saurya Limited
M/s Tata Power Saurya Limited
GUVNL
GUVNL
In the matter of Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Regulation 23 & 8
In the matter of Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Regulation 23 & 80 of GERC (Conduct of Business) Regulations, 2004 seeking extension of Scheduled Commercial Operation Date of the project.
__
5 22/12/2023 11:30 am 2210/2023
Madhya Gujarat Vij Company Limited & Ors
Madhya Gujarat Vij Company Limited & Ors
In the matter of Petition under Sections 61, 66, 86 (1) (e) and 181 and other applicable provisions of the Ele
In the matter of Petition under Sections 61, 66, 86 (1) (e) and 181 and other applicable provisions of the Electricity Act, 2003 read with GERC (Net Metering Rooftop Solar PV Grid Interactive System) Regulations, 2016 and subsequent amendments thereto, for approval of levy of per KW based System strengthening charges from Residential Solar applicants towards expenditure to be incurred by Distribution Licensee for System strengthening of Distribution Network for providing new Solar Rooftop System/enhancement in existing solar capacity to residential category consumers.
__
6 22/12/2023 11:30 am 2240/2023
GUVNL
GUVNL
In the matter of Petition under Section 86 read with Section 63 of the Electricity Act for approval of deviati
In the matter of Petition under Section 86 read with Section 63 of the Electricity Act for approval of deviations from the Guidelines issued by Central Government vide Notification dated 14.10.2018 and subsequent amendments for procurement of power through Tariff Based Competitive Bidding Process from Grid Connected Wind-Solar Hybrid Renewable Energy Projects and for approval of bid documents for carrying out bidding process for procurement of power from  Hybrid Power Projects.
__
7 22/12/2023 11:30 am 2256/2023
Zydus Lifesciences Limited
Zydus Lifesciences Limited
Abellon Co-gen Limited & Ors.
Abellon Co-gen Limited & Ors.
In the matter of Petition under Sections 86 of the Electricity Act, 2003 read with Regulations 80 and 82 of th
In the matter of Petition under Sections 86 of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking recovery of the amount paid for the power injected by Abellon Cogen Limited under the Power Purchase Agreement dated 03.05.2019 for procurement of 3.825 MW from Biomass Pest Renewable Power Plant of Abellon Co-gen Limited.
__
8 22/12/2023 11:30 am 2257/2023
Zydus Lifesciences Limited
Zydus Lifesciences Limited
Goodwatts WTE Botad Pvt. Limited & Ors.
Goodwatts WTE Botad Pvt. Limited & Ors.
In the matter of Petition under Sections 86 of the Electricity Act, 2003 read with Regulations 80 and 82 of th
In the matter of Petition under Sections 86 of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking recovery of the amount paid for the power injected by Abellon Cogen Limited under the Power Purchase Agreement dated 03.05.2019 for procurement of 3.825 MW from Biomass Pest Renewable Power Plant of Abellon Co-gen Limited.
__
9 22/12/2023 11:30 am 2258/2023
Responsive Sutip Limited
Responsive Sutip Limited
GUVNL
GUVNL
In the matter under Section 86 of the Electricity Act, 2003 read with Articles 4, 5, 6 and 10 of the PPA dated
In the matter under Section 86 of the Electricity Act, 2003 read with Articles 4, 5, 6 and 10 of the PPA dated 29.11.2010 seeking directions to GUVNL to refund the wrongfully deducted amount of Rs. 23,97,643/- along with Late Payment Surcharge
__
10 22/12/2023 11:30 am 2259/2023
Vish Wind Infrastrcukture LLP
Vish Wind Infrastrcukture LLP
GUVNL & Ors.
GUVNL & Ors.
In the matter of Petition under Section 86(1) (e) and (f) of the Electricity Act, 2003 read with Regulation 45
In the matter of Petition under Section 86(1) (e) and (f) of the Electricity Act, 2003 read with Regulation 45 of Gujarat Electricity Regulatory Commission seeking appropriate directions against the Respondents to make payment of pending dues of Rs. 91,95, 255/- in lieu of supply of electricity from the Petitioner’s 1.6 MW Wind Power Project during February 2021 to July 2022.
__
11 22/12/2023 11:30 am 2260/2023
PGVCL & others
PGVCL & others
In the matter of Petition under Section 86 and other applicable provisions of the Electricity Act, 2003 for i
In the matter of Petition under Section 86 and other applicable provisions of the Electricity Act, 2003 for implementation of Government of Gujarat GR No. SLR/11/2014/GoI/81154/B1 dated 08.07.2022 & GR No. SLR/e file/20/2022/B1 dated 17.04.2023 for granting regular electricity connection and to convert off-grid stand-alone solar pump sets into grid connected solar pump sets under the supply jurisdiction of State Distribution Licensees.
__
12 22/12/2023 11:30 am 2261/2023
Gujarat Aquaculture Association
Gujarat Aquaculture Association
Energy and Petrochemicals Department, Govt. of Gujarat & Ors
Energy and Petrochemicals Department, Govt. of Gujarat & Ors
In the matter of Petition/Application/Representation to be considered sympathetically and the present electric
In the matter of Petition/Application/Representation to be considered sympathetically and the present electricity tariff be either withdrawn or reduced or subsidized to serve the purpose of the Association as well as the Fisheries business as a whole as per the order of the Hon’ble High Court of Gujarat as well as the letter of the State.
__
13 22/12/2023 11:30 am IA No. 65/2023 & Petition No. 2262/2023
GUVNL
GUVNL
Shree Narmada Khand Udyog Sahakari Mandli Limited
Shree Narmada Khand Udyog Sahakari Mandli Limited
In the matter of filing petition for approval of Power Purchase Agreement executed between Shree Narmada Khand
In the matter of filing petition for approval of Power Purchase Agreement executed between Shree Narmada Khand Udyog Sahakari Mandli Limited and GUVNL for Procurement of 15 MW Power during crushing season and 0 MW power during non-crushing season from their 30 MW Bagasse based co-generation project under Order No. 03 of 2022 dated 27.06.2022 issued by the Commission for “Determination of Tariff for Procurement of Power by the Distribution Licensees and Others from Biomass based Power Projects and Bagasse based Co-generation Projects”, for Control Period from FY 2020-21 to FY 2022-23 in the State of Gujarat.
__
14 22/12/2023 11:30 am 2263/2023
GUVNL
GUVNL
DB Power Limited
DB Power Limited
In the matter of Petition under Section 86 read with Section 63 of the Electricity Act, 2003 seeking adoption
In the matter of Petition under Section 86 read with Section 63 of the Electricity Act, 2003 seeking adoption of tariff discovered under competitive bidding process for procurement of 3000 MW power under long term based on design, build, finance, own and operate (DBFOO) basis using concessional fuel allocated by Coal India Limited (CIL) as per Ministry of Power Guidelines dated 06.03.2019
__
15 22/12/2023 11:30 am 2265/2023
GUVNL
GUVNL
Gujarat State Energy Generation Limited
Gujarat State Energy Generation Limited
In the matter of Petition under Section 86 (1) (b) of the Electricity Act, 2003, seeking approval of the Commi
In the matter of Petition under Section 86 (1) (b) of the Electricity Act, 2003, seeking approval of the Commission for procurement of power on “As and When required basis” from GSEG for a period of 5 years and approval of Power Purchase Agreement dated 24.08.2023.
__
16 22/12/2023 11:30 am 2266/2023 & IA No. 41/2023
Enfinity Global Surya Vayu Energy Pvt. Limited
Enfinity Global Surya Vayu Energy Pvt. Limited
GUVNL
GUVNL
In the matter of Petition under Section 86 of the Electricity Act, 2003 read with Clause 16 of the Procedure f
In the matter of Petition under Section 86 of the Electricity Act, 2003 read with Clause 16 of the Procedure for ‘Grant of Connectivity to projects based on Renewable Sources to Intra-State Transmission System’ approved by the Commission on 07.01.2023 and Connection Agreement dated 24.07.2023 executed between Enfinity Global Surya Vayu Energy Pvt. Ltd., and GETCO, seeking to quash and set aside the Letter dated 16.09.2023 issued by GETCO and for directions to restore the Stage-II Connectivity dated 31.05.2023 granted to Enfinity Global Surya Vayu Energy Pvt. Limited.
__
17 22/12/2023 11:30 am 2267/2023
MGVCL
MGVCL
In the matter of Petition under Sections 63 read with 86 (1) (b) of the Electricity Act, 2003 seeking adoption
In the matter of Petition under Sections 63 read with 86 (1) (b) of the Electricity Act, 2003 seeking adoption of tariff discovered under tariff based competitive bidding process by MGVCL vide RFS No. MGVCL/RA&C/DSM/PM-Kusum-CFLS/ TN-06 dated 21.03.2023 for 3 nos. of solar plants of total 3.0 MW, through RESCO model, for solarisation of various 11 KV feeders in MGVCL level solarisation under PM KUSUM-C Scheme of Govt. of India
__
18 22/12/2023 11:30 am 2268/2023 & IA No. 64/2023
GUVNL
GUVNL
SECI
SECI
In the matter of Petition under Section 86 (1) (b) of the Electricity Act, 2003 for approval of power usage ag
In the matter of Petition under Section 86 (1) (b) of the Electricity Act, 2003 for approval of power usage agreement signed by GUVNL with Solar Energy Corporation of India Limited (SECIL) for procurement of 700 MW power from their Solar PV Power Plant to be set up under MNRE’s CPSU Scheme Phase – II, Tranche-III awarded by IREDA.
__
19 22/12/2023 11:30 am 2269/2023
M/s Monex Solar Power LLP
M/s Monex Solar Power LLP
PGVCL
PGVCL
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for inco
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
__
20 22/12/2023 11:30 am 2270/2023
Ms Parasiya K Chhaganlal
Ms Parasiya K Chhaganlal
PGVCL
PGVCL
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for inco
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA
__
21 22/12/2023 11:30 am 2271/2023
N.R. Solar Park
N.R. Solar Park
PGVCL
PGVCL
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for inco
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
__
22 22/12/2023 11:30 am 2272/2023
Ms Momai Energy Pvt. Limited
Ms Momai Energy Pvt. Limited
PGVCL
PGVCL
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for inco
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
__
23 22/12/2023 11:30 am 2273/2023
Mangalya Energy Pvt. Limited
Mangalya Energy Pvt. Limited
PGVCL
PGVCL
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for inco
In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
__
24 22/12/2023 11:30 am 2274/2023
DGVCL
DGVCL
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act,
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act, 2003 and GERC MYT Regulations, 2016 to  modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
__
25 22/12/2023 11:30 am 2275/2023
PGVCL
PGVCL
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act,
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act, 2003 and GERC MYT Regulations, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
__
26 22/12/2023 11:30 am 2276/2023
UGVCL
UGVCL
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act,
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act, 2003 and GERC MYT Regulations, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
__
27 22/12/2023 11:30 am 2277/2023
MGVCL
MGVCL
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act,
In the matter of Petition under Sections 62, 64 & 86 and other enabling provisions of the Electricity Act, 2003 and GERC MYT Regulations, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category
__
28 22/12/2023 11:30 am 2278/2023
SKY Scheme Committee of Trambovad Feeder
SKY Scheme Committee of Trambovad Feeder
MGVCL & Others
MGVCL & Others
In the matter of Petition for non-compliance of the Order in Petition No. 1729 of 2018 filed for implementatio
In the matter of Petition for non-compliance of the Order in Petition No. 1729 of 2018 filed for implementation of ‘Suryashakti Kishan Yogna (SKY’ notified by the Government of Gujarat vide GR No. SLR/11/2016/2284/B1 dated 27.06.2018 and 29.09.2018 on pilot basis for solarisation of agriculture connections under the supply jurisdiction of State Distribution licensees (i.e., DGVCL, MGVCL, PGVCL and UGVCL).
__
29 22/12/2023 11:30 am 2279/2023
GUVNL
GUVNL
Gujarat Mineral Development Corporation Limited
Gujarat Mineral Development Corporation Limited
In the matter of Petition under Section 86 (1) (b) of the Electricity Act 2003 for approval of amendments to
In the matter of Petition under Section 86 (1) (b) of the Electricity Act 2003 for approval of amendments to the PPA dated 19.02.2000 read with supplementary Agreement dated 17.12.2014 for procurement of power from 2 x 125 MW lignite based thermal power plant established by GMDC at Akrimota, Kutch, Gujarat.
__
30 22/12/2023 11:30 am 2070/2022 & allied IAs
Anisha Power Projects Pvt. Limited
Anisha Power Projects Pvt. Limited
GUVNL & Ors.
GUVNL & Ors.
In the matter of Petition under Section 86 (1) (f) of Electricity Act, 2003 read with Articles 3 (3.3) and 6 
In the matter of Petition under Section 86 (1) (f) of Electricity Act, 2003 read with Articles 3 (3.3) and 6 (6.6) of the PPA dated 19.08.2019 for adjudication of dispute for non-achievement of Financial Closures and Scheduled Commercial Operation Date due to Force Majeure Event as per Article 8 of the PPA, interalia Act of God.
__
31 22/12/2023 11:30 am IA No. 59/2023 in Petition No. 2190/2023
GUVNL
GUVNL
Kedareshwar Khandsari Udyog Pvt. Limited
Kedareshwar Khandsari Udyog Pvt. Limited
In the matter of Application for impleadment of Kedareshwar Khandsari Udyog Pvt. Limited in Petition No. 2190
In the matter of Application for impleadment of Kedareshwar Khandsari Udyog Pvt. Limited in Petition No. 2190 of 2023.
__
32 22/12/2023 11:30 am IA No. 60/ 2023 in Petition No. 2211/2023
GUVNL
GUVNL
Shree Khedut Sahakari Khand Udyog Mandli Limited
Shree Khedut Sahakari Khand Udyog Mandli Limited
In the matter of Application for impleadment of Shree Khedut Sahakari Khand Udyog Mandli Limited in Petition
In the matter of Application for impleadment of Shree Khedut Sahakari Khand Udyog Mandli Limited in Petition No. 2211 of 2023.
__
33 22/12/2023 11:30 am IA No. 62/2023 in Petition No. 2231/2019
Mr. Shaunak Hitesh Sayta
Mr. Shaunak Hitesh Sayta
GUVNL
GUVNL
In the matter of Interim Application based on principles analogous to Order XVI Rule 1A of Civil Procedure Co
In the matter of Interim Application based on principles analogous to Order XVI Rule 1A of Civil Procedure Code 1908 seeking permission of the Commission to conduct examination in chief, of thirdparty witnesses and cross examination of witnesses of the Respondent. The Petitioner seeking to call third parties for examination in chief, i.e., persons other than the Petitioner getting and/or using electricity supply from the same feeder as the Petitioner, who are expected to testify interalia that the Respondent herein does not provide 24x7 power supply.
__
34 22/12/2023 11:30 am IA No. 63/2023 in Petition No. 2129/2022
GUVNL
GUVNL
M/s Vivek Trading Company
M/s Vivek Trading Company
In the matter of Interim Application filed by the Petitioner under Order 22 Rule 4 of the Code of Civil Proce
In the matter of Interim Application filed by the Petitioner under Order 22 Rule 4 of the Code of Civil Procedure, 1908.
__