![Loading Events](https://gercin.org/wp-content/plugins/the-events-calendar/src/resources/images/tribe-loading.gif)
- This event has passed.
1656/2017
November 21, 2017 @ 6:00 am - 12:30 pm UTC+5.5
In the matter under Section 86 (1) (f) of the Electricity Act, 2003 for recovery of liquidated damages payable under the PPA dated 15.05.2010 between GUVNL and Essar Power Gujarat Limited.