Loading Events

« All Events

  • This event has passed.

1418/2018

July 3, 2019 @ 6:00 am - 12:30 pm UTC+5.5

In the matter of filing petition for approval of purchase of power to be generated from Rooftop Solar Power Generation Projects at 14 different sites by Surat Municipal Corporation aggregating to installed capacity of 750 KWp on a Long-Term basis at the tariff to be determined by the GERC under Section 86 (1) (b) read with Section 86 (1) (e) of the Electricity Act, 2003

Details

Date:
July 3, 2019
Time:
6:00 am - 12:30 pm UTC+5.5
Event Category: