- This event has passed.
1657/2017
September 20, 2017 @ 6:00 am - 12:30 pm UTC+5.5
In the matter under Section 86 (1) (f) of the Electricity Act, 2003 for recovery of liquidated damages payable under the PPA dated 15.05.2010 between GUVNL and Shapoorji Pallonji Energy (Gujarat) Pvt. Limited.