- This event has passed.
2308/2024
September 11 @ 6:00 am - 11:30 am UTC+5.5
In the matter of Petition under Section 86 (1) (f) of the EA, 2003 read with Article 8 of the PPA dated 30.01.2021 executed between Torrent Solar Power Private Limited and Gujarat Urja Vikas Nigam Limited for Solar Energy Based Power Plant of 100 MW capacity with new Solar Photovoltaic Grid Interactive Power Plant.