Daily Orders
Petition No Order Date Petitioner Respondent Download Matter Download PDF
2553/2025 05-09-2026 M/s Blue Craft Business Ventures LLP GUVNL & UGVCL Petition for challenging the action of the Respondents for contravention of Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with Section 142 of the Electricity Act, 2003. View PDF
2554/2025 05-09-2026 Vishal Foundry E&PD, GoG & Others Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ dePine Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the green energy open access consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2555/2025 05-09-2026 M/s OM Vinyls Pvt. Limited EPD, GoG & Ors. Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ dePine Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the green energy open access consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2556/2025 05-09-2026 M/s Amtech Technocast EPD, GoG & Ors. Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of the Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ deQine Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the Green Energy Open Access Consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2557/2025 05-09-2026 M/s Atul Precision Cast Pvt. Limited EPD, GoG & Ors. Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of the Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ define Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the Green Energy Open Access Consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2558/2025 05-09-2026 M/s PR Technocast EPD, GoG & Ors. Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of the Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ dePine Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the Green Energy Open Access Consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2578/2025 & allied IAs 05-09-2026 Solarcraft Power India 3 Private Limited GUVNL Petition under Section 86(1)(a) read with Section 86 (1)(f) of the Electricity Act, 2003 read with Article 8 of the Power Purchase Agreement dated 14.12.2022 executed between the Petitioner and the Respondent seeking extension of SCOD due to various events of Force Majeure. inter-alia, on account of delays caused due to reasons and unforeseen events not attributable to the Petitioner and declaration that such extended Scheduled Commercial Operation Date shall stand substituted for all references to Scheduled Commercial Operation Date in such Power Purchase Agreement. View PDF
2579/2025 05-09-2026 M/s Anand Liners (India) Pvt. Limited EPD, GoG & Ors. Petition under the Regulations 28, 29, 30 and 31 of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 read with provisions of the Electricity Act, 2003. By way of preferring the present Petition, the Applicant prays before the Commission to amend/ clarify/ deQine Regulation 17.6 (vi) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 which provides ‘permitted quantum of banked energy by the Green Energy Open Access Consumers to the extent of at least 30% of total consumption of electricity from the distribution licensee by the consumers during the billing period’, but the same does not provide for maximum upper limit, up to which the quantum of banked energy can be permitted. View PDF
2695/2026 05-09-2026 GUVNL Welspun Renewable Energy Limited Petition under Section 63 read with Section 86 (1) (b) of the Electricity Act, 2003, seeking adoption of tariff discovered under the Competitive Bidding Process conducted RfS No. GUVNL/ 625 MW / Solar (Phase XXVIII) dated 21.11.2025 issued by GUVNL for procurement of power through competitive bidding process (followed by e-reverse auction) from 625 MW Grid connected Solar Photovoltaic Power Projects to be set up/under construction/already commissioned projects anywhere in India with Greenshoe Option of additional capacity up to 625 MW without energy storage. View PDF
2287/2023 25-08-2026 Continuum Green Energy Limited & Others UGVCL Petition under Section 86 (1) (f) of the Electricity Act, 2003 read with Regulations 23 and 80 of the GERC (Conduct of Business) Regulations, 2004 challenging the letters dated 22.02.2022 and 29.11.2022 issued by UGVCL imposing the liability towards Additional Surcharge upon M/s Tata Motors Limited being the consumer of Continuum Green Energy (India) Pvt. Limited despite the same being exempted by the virtue of applicability of Wind Power Policy, 2007 issued by Energy and Petrochemicals Department, Government of Gujarat and Order No. 1 of 2010 dated 30.01.2010, Order No. 02 of 2012 dated 08.08.2012 and Order dated 12.03.2014 in Petition No. 1302 of 2013 passed by the Commission. View PDF