        BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Gujarat Electricity Regulatory Commission - ECPv5.3.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Gujarat Electricity Regulatory Commission
X-ORIGINAL-URL:https://gercin.org
X-WR-CALDESC:Events for Gujarat Electricity Regulatory Commission
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
TZOFFSETFROM:+0530
TZOFFSETTO:+0530
TZNAME:IST
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111325Z
LAST-MODIFIED:20231216T111325Z
UID:36459-1703244600-1703264400@gercin.org
SUMMARY:2145 of 2023 & allied IAs
DESCRIPTION:In the matter of Petition under Section 86 (1) (c)\, 86 (1)\, (i)\, 86 (1) (k)\, Section 40(a) and Section 42(1) of the Electricity Act\, 2003 read with Regulation 9 and 10 if the GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations\, 2005 and Regulation 4.37 of the GERC (Electricity Supply Code and Related Matters) Regulations\, 2015
URL:https://gercin.org/hearing-schedule/2145-of-2023-allied-ias/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111432Z
LAST-MODIFIED:20231216T111432Z
UID:36461-1703244600-1703264400@gercin.org
SUMMARY:2191/2023
DESCRIPTION:In the matter of Petition under Section 45\, 46\, 86 and other provisions of the Electricity Act\, 2003 read with GERC (Licensee’s Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges) Regulations\, 2005 for approval of levy of per KVA based charges from applicant  toward expenditure to be incurred by Distribution Licensee for development of underground electrical network for providing power supply at 11 KV/22 KV voltage level to new HT connection/additional demand.
URL:https://gercin.org/hearing-schedule/2191-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111520Z
LAST-MODIFIED:20231216T111520Z
UID:36463-1703244600-1703264400@gercin.org
SUMMARY:2199/2023
DESCRIPTION:In the matter of Petition under Section 86 (1) (b) read with Section 63 of the Electricity Act\, 2003 along with “Guidelines for Procurement of Power by the distribution licensees” issued by the Commission for seeking approval of the quantum and deviations from the Model Bidding documents as per the Ministry of Power’s Guidelines dated 06.03.2019 for Procurement of 2077 MW Power under Long-Term from Power Stations set up on Design\, Build\, Finance\, Own and Operate (DBFOO).
URL:https://gercin.org/hearing-schedule/2199-2023-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111702Z
LAST-MODIFIED:20231216T111702Z
UID:36465-1703244600-1703264400@gercin.org
SUMMARY:2206/2023
DESCRIPTION:In the matter of Petition under Section 86(1) (f) of the Electricity Act\, 2003 read with Regulation 23 & 80 of GERC (Conduct of Business) Regulations\, 2004 seeking extension of Scheduled Commercial Operation Date of the project.
URL:https://gercin.org/hearing-schedule/2206-2023-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111750Z
LAST-MODIFIED:20231216T111750Z
UID:36467-1703244600-1703264400@gercin.org
SUMMARY:2210/2023
DESCRIPTION:In the matter of Petition under Sections 61\, 66\, 86 (1) (e) and 181 and other applicable provisions of the Electricity Act\, 2003 read with GERC (Net Metering Rooftop Solar PV Grid Interactive System) Regulations\, 2016 and subsequent amendments thereto\, for approval of levy of per KW based System strengthening charges from Residential Solar applicants towards expenditure to be incurred by Distribution Licensee for System strengthening of Distribution Network for providing new Solar Rooftop System/enhancement in existing solar capacity to residential category consumers.
URL:https://gercin.org/hearing-schedule/2210-2023-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111831Z
LAST-MODIFIED:20231216T111831Z
UID:36469-1703244600-1703264400@gercin.org
SUMMARY:2240/2023
DESCRIPTION:In the matter of Petition under Section 86 read with Section 63 of the Electricity Act for approval of deviations from the Guidelines issued by Central Government vide Notification dated 14.10.2018 and subsequent amendments for procurement of power through Tariff Based Competitive Bidding Process from Grid Connected Wind-Solar Hybrid Renewable Energy Projects and for approval of bid documents for carrying out bidding process for procurement of power from  Hybrid Power Projects.
URL:https://gercin.org/hearing-schedule/2240-2023-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T111910Z
LAST-MODIFIED:20231216T111910Z
UID:36471-1703244600-1703264400@gercin.org
SUMMARY:2256/2023
DESCRIPTION:In the matter of Petition under Sections 86 of the Electricity Act\, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations\, 2004 seeking recovery of the amount paid for the power injected by Abellon Cogen Limited under the Power Purchase Agreement dated 03.05.2019 for procurement of 3.825 MW from Biomass Pest Renewable Power Plant of Abellon Co-gen Limited.
URL:https://gercin.org/hearing-schedule/2256-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112042Z
LAST-MODIFIED:20231216T112050Z
UID:36473-1703244600-1703264400@gercin.org
SUMMARY:2257/2023
DESCRIPTION:In the matter of Petition under Sections 86 of the Electricity Act\, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations\, 2004 seeking recovery of the amount paid for the power injected by Abellon Cogen Limited under the Power Purchase Agreement dated 03.05.2019 for procurement of 3.825 MW from Biomass Pest Renewable Power Plant of Abellon Co-gen Limited.
URL:https://gercin.org/hearing-schedule/2257-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112134Z
LAST-MODIFIED:20231216T112134Z
UID:36475-1703244600-1703264400@gercin.org
SUMMARY:2258/2023
DESCRIPTION:In the matter under Section 86 of the Electricity Act\, 2003 read with Articles 4\, 5\, 6 and 10 of the PPA dated 29.11.2010 seeking directions to GUVNL to refund the wrongfully deducted amount of Rs. 23\,97\,643/- along with Late Payment Surcharge
URL:https://gercin.org/hearing-schedule/2258-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112259Z
LAST-MODIFIED:20231216T112433Z
UID:36477-1703244600-1703264400@gercin.org
SUMMARY:2259/2023
DESCRIPTION:In the matter of Petition under Section 86(1) (e) and (f) of the Electricity Act\, 2003 read with Regulation 45 of Gujarat Electricity Regulatory Commission seeking appropriate directions against the Respondents to make payment of pending dues of Rs. 91\,95\, 255/- in lieu of supply of electricity from the Petitioner’s 1.6 MW Wind Power Project during February 2021 to July 2022.
URL:https://gercin.org/hearing-schedule/2259-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112359Z
LAST-MODIFIED:20231216T112359Z
UID:36479-1703244600-1703264400@gercin.org
SUMMARY:2260/2023
DESCRIPTION:In the matter of Petition under Section 86 and other applicable provisions of the Electricity Act\, 2003 for implementation of Government of Gujarat GR No. SLR/11/2014/GoI/81154/B1 dated 08.07.2022 & GR No. SLR/e file/20/2022/B1 dated 17.04.2023 for granting regular electricity connection and to convert off-grid stand-alone solar pump sets into grid connected solar pump sets under the supply jurisdiction of State Distribution Licensees.
URL:https://gercin.org/hearing-schedule/2260-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112537Z
LAST-MODIFIED:20231216T112537Z
UID:36482-1703244600-1703264400@gercin.org
SUMMARY:2261/2023
DESCRIPTION:In the matter of Petition/Application/Representation to be considered sympathetically and the present electricity tariff be either withdrawn or reduced or subsidized to serve the purpose of the Association as well as the Fisheries business as a whole as per the order of the Hon’ble High Court of Gujarat as well as the letter of the State.
URL:https://gercin.org/hearing-schedule/2261-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112738Z
LAST-MODIFIED:20231216T112738Z
UID:36484-1703244600-1703264400@gercin.org
SUMMARY:IA No. 65/2023 & Petition No. 2262/2023
DESCRIPTION:In the matter of filing petition for approval of Power Purchase Agreement executed between Shree Narmada Khand Udyog Sahakari Mandli Limited and GUVNL for Procurement of 15 MW Power during crushing season and 0 MW power during non-crushing season from their 30 MW Bagasse based co-generation project under Order No. 03 of 2022 dated 27.06.2022 issued by the Commission for “Determination of Tariff for Procurement of Power by the Distribution Licensees and Others from Biomass based Power Projects and Bagasse based Co-generation Projects”\, for Control Period from FY 2020-21 to FY 2022-23 in the State of Gujarat.
URL:https://gercin.org/hearing-schedule/ia-no-65-2023-petition-no-2262-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112825Z
LAST-MODIFIED:20231216T112825Z
UID:36486-1703244600-1703264400@gercin.org
SUMMARY:2263/2023
DESCRIPTION:In the matter of Petition under Section 86 read with Section 63 of the Electricity Act\, 2003 seeking adoption of tariff discovered under competitive bidding process for procurement of 3000 MW power under long term based on design\, build\, finance\, own and operate (DBFOO) basis using concessional fuel allocated by Coal India Limited (CIL) as per Ministry of Power Guidelines dated 06.03.2019
URL:https://gercin.org/hearing-schedule/2263-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T112926Z
LAST-MODIFIED:20231216T112926Z
UID:36488-1703244600-1703264400@gercin.org
SUMMARY:2265/2023
DESCRIPTION:In the matter of Petition under Section 86 (1) (b) of the Electricity Act\, 2003\, seeking approval of the Commission for procurement of power on “As and When required basis” from GSEG for a period of 5 years and approval of Power Purchase Agreement dated 24.08.2023.
URL:https://gercin.org/hearing-schedule/2265-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113026Z
LAST-MODIFIED:20231216T113026Z
UID:36490-1703244600-1703264400@gercin.org
SUMMARY:2266/2023 & IA No. 41/2023
DESCRIPTION:In the matter of Petition under Section 86 of the Electricity Act\, 2003 read with Clause 16 of the Procedure for ‘Grant of Connectivity to projects based on Renewable Sources to Intra-State Transmission System’ approved by the Commission on 07.01.2023 and Connection Agreement dated 24.07.2023 executed between Enfinity Global Surya Vayu Energy Pvt. Ltd.\, and GETCO\, seeking to quash and set aside the Letter dated 16.09.2023 issued by GETCO and for directions to restore the Stage-II Connectivity dated 31.05.2023 granted to Enfinity Global Surya Vayu Energy Pvt. Limited.
URL:https://gercin.org/hearing-schedule/2266-2023-ia-no-41-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113108Z
LAST-MODIFIED:20231216T113108Z
UID:36492-1703244600-1703264400@gercin.org
SUMMARY:2267/2023
DESCRIPTION:In the matter of Petition under Sections 63 read with 86 (1) (b) of the Electricity Act\, 2003 seeking adoption of tariff discovered under tariff based competitive bidding process by MGVCL vide RFS No. MGVCL/RA&C/DSM/PM-Kusum-CFLS/ TN-06 dated 21.03.2023 for 3 nos. of solar plants of total 3.0 MW\, through RESCO model\, for solarisation of various 11 KV feeders in MGVCL level solarisation under PM KUSUM-C Scheme of Govt. of India
URL:https://gercin.org/hearing-schedule/2267-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113149Z
LAST-MODIFIED:20231216T113149Z
UID:36494-1703244600-1703264400@gercin.org
SUMMARY:2268/2023 & IA No. 64/2023
DESCRIPTION:In the matter of Petition under Section 86 (1) (b) of the Electricity Act\, 2003 for approval of power usage agreement signed by GUVNL with Solar Energy Corporation of India Limited (SECIL) for procurement of 700 MW power from their Solar PV Power Plant to be set up under MNRE’s CPSU Scheme Phase – II\, Tranche-III awarded by IREDA.
URL:https://gercin.org/hearing-schedule/2268-2023-ia-no-64-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113235Z
LAST-MODIFIED:20231216T113235Z
UID:36496-1703244600-1703264400@gercin.org
SUMMARY:2269/2023
DESCRIPTION:In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act\, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
URL:https://gercin.org/hearing-schedule/2269-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113327Z
LAST-MODIFIED:20231216T113327Z
UID:36498-1703244600-1703264400@gercin.org
SUMMARY:2270/2023
DESCRIPTION:In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act\, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA
URL:https://gercin.org/hearing-schedule/2270-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113411Z
LAST-MODIFIED:20231216T113411Z
UID:36500-1703244600-1703264400@gercin.org
SUMMARY:2271/2023
DESCRIPTION:In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act\, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
URL:https://gercin.org/hearing-schedule/2271-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113500Z
LAST-MODIFIED:20231216T113500Z
UID:36502-1703244600-1703264400@gercin.org
SUMMARY:2272/2023
DESCRIPTION:In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act\, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
URL:https://gercin.org/hearing-schedule/2272-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113556Z
LAST-MODIFIED:20231216T113556Z
UID:36504-1703244600-1703264400@gercin.org
SUMMARY:2273/2023
DESCRIPTION:In the matter of Miscellaneous Petition under Section 86 (1) (b) and (e) of the Electricity Act\, 2003 for incorporating provision regarding “Change in Law” in the PPA to be executed by State DISCOMs with Project Developers under the Government of Gujarat’s “Policy for Development of Small Scale Distributed Solar Projects 2019” notified vide G.R. No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of draft PPA”.
URL:https://gercin.org/hearing-schedule/2273-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113648Z
LAST-MODIFIED:20231216T113648Z
UID:36506-1703244600-1703264400@gercin.org
SUMMARY:2274/2023
DESCRIPTION:In the matter of Petition under Sections 62\, 64 & 86 and other enabling provisions of the Electricity Act\, 2003 and GERC MYT Regulations\, 2016 to  modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
URL:https://gercin.org/hearing-schedule/2274-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113729Z
LAST-MODIFIED:20231216T113729Z
UID:36508-1703244600-1703264400@gercin.org
SUMMARY:2275/2023
DESCRIPTION:In the matter of Petition under Sections 62\, 64 & 86 and other enabling provisions of the Electricity Act\, 2003 and GERC MYT Regulations\, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
URL:https://gercin.org/hearing-schedule/2275-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113808Z
LAST-MODIFIED:20231216T113808Z
UID:36510-1703244600-1703264400@gercin.org
SUMMARY:2276/2023
DESCRIPTION:In the matter of Petition under Sections 62\, 64 & 86 and other enabling provisions of the Electricity Act\, 2003 and GERC MYT Regulations\, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category.
URL:https://gercin.org/hearing-schedule/2276-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113847Z
LAST-MODIFIED:20231216T113847Z
UID:36512-1703244600-1703264400@gercin.org
SUMMARY:2277/2023
DESCRIPTION:In the matter of Petition under Sections 62\, 64 & 86 and other enabling provisions of the Electricity Act\, 2003 and GERC MYT Regulations\, 2016 to modify/amend the provisions of applicability of Residential General Purpose (RGP) tariff category under Tariff Order dated 31.03.2023 issued by the Commission in Order to include animal husbandry activities involving not more than 30 milky animals under ambit of RGP Tariff category
URL:https://gercin.org/hearing-schedule/2277-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T113933Z
LAST-MODIFIED:20231216T113933Z
UID:36515-1703244600-1703264400@gercin.org
SUMMARY:2278/2023
DESCRIPTION:In the matter of Petition for non-compliance of the Order in Petition No. 1729 of 2018 filed for implementation of ‘Suryashakti Kishan Yogna (SKY’ notified by the Government of Gujarat vide GR No. SLR/11/2016/2284/B1 dated 27.06.2018 and 29.09.2018 on pilot basis for solarisation of agriculture connections under the supply jurisdiction of State Distribution licensees (i.e.\, DGVCL\, MGVCL\, PGVCL and UGVCL).
URL:https://gercin.org/hearing-schedule/2278-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T114114Z
LAST-MODIFIED:20231216T114114Z
UID:36517-1703244600-1703264400@gercin.org
SUMMARY:2279/2023
DESCRIPTION:In the matter of Petition under Section 86 (1) (b) of the Electricity Act 2003 for approval of amendments to the PPA dated 19.02.2000 read with supplementary Agreement dated 17.12.2014 for procurement of power from 2 x 125 MW lignite based thermal power plant established by GMDC at Akrimota\, Kutch\, Gujarat.
URL:https://gercin.org/hearing-schedule/2279-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20231222T113000
DTEND;TZID=Asia/Kolkata:20231222T170000
DTSTAMP:20260406T021534
CREATED:20231216T114205Z
LAST-MODIFIED:20231216T114205Z
UID:36519-1703244600-1703264400@gercin.org
SUMMARY:2070/2022 & allied IAs
DESCRIPTION:In the matter of Petition under Section 86 (1) (f) of Electricity Act\, 2003 read with Articles 3 (3.3) and 6 (6.6) of the PPA dated 19.08.2019 for adjudication of dispute for non-achievement of Financial Closures and Scheduled Commercial Operation Date due to Force Majeure Event as per Article 8 of the PPA\, interalia Act of God.
URL:https://gercin.org/hearing-schedule/2070-2022-allied-ias/