BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T170722Z
LAST-MODIFIED:20221027T170722Z
UID:32374-1668079800-1668099600@gercin.org
SUMMARY:2107/2022
DESCRIPTION:In the matter of Petition under Sections 2 (21) (b)\, 55 (1) and Section 177 (c) of the Electricity Act\, 2003 for the LT Power capacitors are string devices used to correct PF and they consume the smallest amount of energy.
URL:https://gercin.org/hearing-schedule/2107-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T170858Z
LAST-MODIFIED:20221027T170858Z
UID:32376-1668079800-1668099600@gercin.org
SUMMARY:2108/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2108-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171022Z
LAST-MODIFIED:20221027T171022Z
UID:32378-1668079800-1668099600@gercin.org
SUMMARY:2109/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2109-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171138Z
LAST-MODIFIED:20221027T171138Z
UID:32381-1668079800-1668099600@gercin.org
SUMMARY:2110/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2110-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171310Z
LAST-MODIFIED:20221027T171310Z
UID:32384-1668079800-1668099600@gercin.org
SUMMARY:2111/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2111-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171400Z
LAST-MODIFIED:20221027T171400Z
UID:32386-1668079800-1668099600@gercin.org
SUMMARY:2112/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2112-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171522Z
LAST-MODIFIED:20221027T171522Z
UID:32388-1668079800-1668099600@gercin.org
SUMMARY:2113/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2113-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171605Z
LAST-MODIFIED:20221027T171605Z
UID:32390-1668079800-1668099600@gercin.org
SUMMARY:2114/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2114-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171653Z
LAST-MODIFIED:20221027T171700Z
UID:32392-1668079800-1668099600@gercin.org
SUMMARY:2115/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2115-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171750Z
LAST-MODIFIED:20221027T171750Z
UID:32394-1668079800-1668099600@gercin.org
SUMMARY:2116/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2116-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T171844Z
LAST-MODIFIED:20221027T171844Z
UID:32396-1668079800-1668099600@gercin.org
SUMMARY:2117/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2117-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172106Z
LAST-MODIFIED:20221027T172106Z
UID:32398-1668079800-1668099600@gercin.org
SUMMARY:2118/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2118-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172204Z
LAST-MODIFIED:20221027T172204Z
UID:32400-1668079800-1668099600@gercin.org
SUMMARY:2119/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2119-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172301Z
LAST-MODIFIED:20221027T172301Z
UID:32402-1668079800-1668099600@gercin.org
SUMMARY:2120/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2120-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172350Z
LAST-MODIFIED:20221027T172400Z
UID:32404-1668079800-1668099600@gercin.org
SUMMARY:2121/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2121-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172459Z
LAST-MODIFIED:20221027T172459Z
UID:32406-1668079800-1668099600@gercin.org
SUMMARY:2122/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2122-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172601Z
LAST-MODIFIED:20221027T172601Z
UID:32408-1668079800-1668099600@gercin.org
SUMMARY:2123/2022
DESCRIPTION:In the matter of Petition under Section 86 (1) (b)\, (e)\, (f) of the Electricity Act\, 2003 read with Regulations 23\, 80\, 81 and 82 of the GERC (Conduct of Business) Regulations\, 2004 amendments thereunder read with Article 3.3\, 8 & 11 of the PPA dated 19.04.2021 for Small Scale Distributed Solar Projects of 4 MW capacity with GUVNL seeking extension of Scheduled Commercial Operation Date on account of Force Majeure Events.
URL:https://gercin.org/hearing-schedule/2123-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172726Z
LAST-MODIFIED:20221027T172726Z
UID:32410-1668079800-1668099600@gercin.org
SUMMARY:2129/2022
DESCRIPTION:In the matter of filing of Petition under Section 86 of the Electricity Act\, 2003 for recovery of termination compensation under the Power Purchase Agreement (PPA) dated 23.05.2007.
URL:https://gercin.org/hearing-schedule/2129-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172826Z
LAST-MODIFIED:20221027T172826Z
UID:32412-1668079800-1668099600@gercin.org
SUMMARY:2130/2022
DESCRIPTION:In the matter of Petition under Section 18 read with the functions of the Commission under Section 17 of the Gujarat Electricity Industry (Reorganization & Regulation) Act\, 2003 for non-compliance of GERC Policy\, Circulars issued by Union of India and State of Gujarat and also for non-compliance of contractual obligations and gross deficiency on services.
URL:https://gercin.org/hearing-schedule/2130-2022/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T172930Z
LAST-MODIFIED:20221109T122922Z
UID:32414-1668079800-1668099600@gercin.org
SUMMARY:2136/2022 & allied IAs
DESCRIPTION:In the matter of Petition under Section 86(1) (f) of the Electricity Act\, 2003 read with Articles 11 of the Power Purchase Agreement dated 08.07.2020 read with Supplementary PPA dated 25.04.2022 executed between Juniper Green Three Private Limited and Gujarat Urja Vikas Nigam Limited seeking refund of Rs. 31\,23\,372/- unliterally and illegally deducted by GUVNL
URL:https://gercin.org/hearing-schedule/2136-2022-allied-ias/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20221110T113000
DTEND;TZID=Asia/Kolkata:20221110T170000
DTSTAMP:20260405T210332
CREATED:20221027T173018Z
LAST-MODIFIED:20221027T173018Z
UID:32416-1668079800-1668099600@gercin.org
SUMMARY:2137/2022
DESCRIPTION:In the matter of Petition under Section 181 read with Sections 86(1)(e) and 92 of the Electricity Act\, 2003 read with Regulation 12 of the GERC (Procurement of Energy from Renewable Sources) Regulations\, 2010 and other applicable Sections\, Regulations etc. seeking exemption from Renewable Purchase Obligations.
URL:https://gercin.org/hearing-schedule/2137-2022/