BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T100034Z
LAST-MODIFIED:20260519T100034Z
UID:46149-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/20/2026
DESCRIPTION:Review of case no.05/2026
URL:https://gercin.org/hearing-schedule/omb-rjt-20-2026-3/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T100237Z
LAST-MODIFIED:20260519T100237Z
UID:46151-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/26/2026
DESCRIPTION:Non-Implementation of CGRF Order
URL:https://gercin.org/hearing-schedule/omb-rjt-26-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T100658Z
LAST-MODIFIED:20260519T100658Z
UID:46153-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/28/2026
DESCRIPTION:Estimate Related
URL:https://gercin.org/hearing-schedule/omb-rjt-28-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T100831Z
LAST-MODIFIED:20260519T100831Z
UID:46155-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/29/2026
DESCRIPTION:Estimate Related
URL:https://gercin.org/hearing-schedule/omb-rjt-29-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T101028Z
LAST-MODIFIED:20260519T101028Z
UID:46157-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/30/2026
DESCRIPTION:Maintenance of line
URL:https://gercin.org/hearing-schedule/omb-rjt-30-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260602T113000
DTEND;TZID=Asia/Kolkata:20260602T170000
DTSTAMP:20260626T061607
CREATED:20260519T101216Z
LAST-MODIFIED:20260519T101216Z
UID:46159-1780399800-1780419600@gercin.org
SUMMARY:OMB/RJT/31/2026
DESCRIPTION:Estimate related
URL:https://gercin.org/hearing-schedule/omb-rjt-31-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260609T113000
DTEND;TZID=Asia/Kolkata:20260609T170000
DTSTAMP:20260626T061607
CREATED:20260604T124131Z
LAST-MODIFIED:20260604T124131Z
UID:46345-1781004600-1781024400@gercin.org
SUMMARY:2354/2024 & allied IAs
DESCRIPTION:Petition under Section 86 of the Electricity Act\, 2003 read with GERC (Gujarat Electricity Grid Code) Regulations\, 2013 and CERC (Indian Electricity Grid Code) Regulations\, 2010 (as amended from time to time) seeking directions to the Respondent to comply with the Grid Code and to take permanent measures to overcome the issue of high voltage in GETCO’s Transmission System and overloading of 66 kV Jetpur-Mevasa\nTransmission Line and to compensate the Petitioner for the financial loss suffered on account of generation loss due to continuous curtailment of Petitioner’s generation by GETCO.
URL:https://gercin.org/hearing-schedule/2354-2024-allied-ias/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260609T113000
DTEND;TZID=Asia/Kolkata:20260609T170000
DTSTAMP:20260626T061607
CREATED:20260604T124220Z
LAST-MODIFIED:20260604T124220Z
UID:46347-1781004600-1781024400@gercin.org
SUMMARY:2659/2026
DESCRIPTION:Petition under Section 86 (1) (c)\, (e) and (f) and other applicable Sections of EA\, 2003 read with Clause 2.9 & 3.9 of GERC’ Order No. 06 of 2024 dated 31.08.2024 and Order in Petition No. 2564 of 2025 dated 21.01.2026 seeking extension of scheduled date of commissioning of infrastructure being developed by the Petitioner for 2.64 MW AC/3 MW DC Solar Power Plant for captive use on account of unforeseen reasons and to get refund of Rs. 26\,40\,000/- collected by the Respondent PGVCL by illegal invocation of Bank Guarantee provided against the execution of this solar project.
URL:https://gercin.org/hearing-schedule/2659-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260609T113000
DTEND;TZID=Asia/Kolkata:20260609T170000
DTSTAMP:20260626T061607
CREATED:20260604T124302Z
LAST-MODIFIED:20260604T124302Z
UID:46349-1781004600-1781024400@gercin.org
SUMMARY:2661/2026
DESCRIPTION:In the matter of tariff for agricultural consumers of TPL (Ahmedabad Unit).
URL:https://gercin.org/hearing-schedule/2661-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260615T123000
DTEND;TZID=Asia/Kolkata:20260615T170000
DTSTAMP:20260626T061607
CREATED:20260608T093722Z
LAST-MODIFIED:20260608T093749Z
UID:46371-1781526600-1781542800@gercin.org
SUMMARY:Public Hearing on Draft GERC (GIBESS) Regulations\, 2026
DESCRIPTION:Draft GERC (Grid Interactive Battery Energy Storage System) Regulations\, 2026
URL:https://gercin.org/hearing-schedule/public-hearing-on-draft-gerc-gibess-regulations-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260602T120946Z
LAST-MODIFIED:20260602T120946Z
UID:46326-1781609400-1781629200@gercin.org
SUMMARY:OMB/RJT/32/2026
DESCRIPTION:Billing related
URL:https://gercin.org/hearing-schedule/omb-rjt-32-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260602T121250Z
LAST-MODIFIED:20260602T121250Z
UID:46328-1781609400-1781629200@gercin.org
SUMMARY:OMB/RJT/33/2026
DESCRIPTION:Billing related
URL:https://gercin.org/hearing-schedule/omb-rjt-33-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260602T121433Z
LAST-MODIFIED:20260602T121433Z
UID:46330-1781609400-1781629200@gercin.org
SUMMARY:OMB/RJT/34/2026
DESCRIPTION:Billing related
URL:https://gercin.org/hearing-schedule/omb-rjt-34-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120339Z
LAST-MODIFIED:20260610T120339Z
UID:46400-1781609400-1781629200@gercin.org
SUMMARY:1024/2010 (Remand matter)
DESCRIPTION:Petition for fixation of tariff for two small hydro power projects of 3 MW and 2.6 MW at Daman Ganga Dam/ Madhuban Reservoir under Section 62 read with Section 86(1)(a) of the Electricity Act\,2003.
URL:https://gercin.org/hearing-schedule/1024-2010-remand-matter/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120440Z
LAST-MODIFIED:20260610T120440Z
UID:46402-1781609400-1781629200@gercin.org
SUMMARY:2192/2023
DESCRIPTION:Petition under Sections 86 (1) (a) (b) (e) and (f)\, Section 61 (a) and Section 10 (91) of the Electricity Act\, 2003 read with Gujarat Government Policy for Small\, Scale Distributed Power Projects (SSDSP) notified vide GR No. SLR/11/2019/51/B1 dated 06.03.2019 and approval of for draft PPA and collection of Supervision Charge and Connectivity Charge by the Distribution licensees from the Applicants of SSDSP Projects with respect to GERC Regulations notified vide Notification No. 9 of 2005 and Notification No. 3 of 2011.
URL:https://gercin.org/hearing-schedule/2192-2023-3/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120522Z
LAST-MODIFIED:20260610T120522Z
UID:46404-1781609400-1781629200@gercin.org
SUMMARY:2494/2025
DESCRIPTION:Petition under Sections 61\, 62\, 86 (1) (e) of EA\, 2003 read with other applicable provisions of the Electricity Act\, 2003 for appropriate order in regard to connectivity sought for during the period from 01.10.2023 to 31.08.2024 by certain class of consumers.
URL:https://gercin.org/hearing-schedule/2494-2025-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120613Z
LAST-MODIFIED:20260610T120613Z
UID:46406-1781609400-1781629200@gercin.org
SUMMARY:2626/2026
DESCRIPTION:Petition is filed under Sections 86 (1) (K) and Section 94 of the Electricity Act\, 2003 for seeking clarification and Regulatory interpretation and appropriate modi5ication of Clause 5.7(iv) of the Connectivity Procedure\, 2025 issued by Gujarat Energy Transmission Corporation Limited (GETCO) and endorsed by the Commission.
URL:https://gercin.org/hearing-schedule/2626-2026-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120709Z
LAST-MODIFIED:20260610T120709Z
UID:46408-1781609400-1781629200@gercin.org
SUMMARY:2634/2026
DESCRIPTION:Petition is filed under Sections 86 (1) (K) and Section 94 of the Electricity Act\, 2003 for seeking clarification and Regulatory interpretation and appropriate modification of Clause 5.7(iv) of the Connectivity Procedure\, 2025 issued by Gujarat Energy Transmission Corporation Limited (GETCO) and endorsed by the Commission.
URL:https://gercin.org/hearing-schedule/2634-2026-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260616T113000
DTEND;TZID=Asia/Kolkata:20260616T170000
DTSTAMP:20260626T061607
CREATED:20260610T120752Z
LAST-MODIFIED:20260610T120752Z
UID:46410-1781609400-1781629200@gercin.org
SUMMARY:2660/2026
DESCRIPTION:Petition Section 63 read with Section 86 (1) (b) of the Electricity Act\, 2003 for adoption of tariff discovered under Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid connected Renewable Energy Power Projects with Energy Storage Systems through RfS No. TPL/FDRE/01/2025 dated 08.08.2025.
URL:https://gercin.org/hearing-schedule/2660-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260618T113000
DTEND;TZID=Asia/Kolkata:20260618T170000
DTSTAMP:20260626T061607
CREATED:20260608T093949Z
LAST-MODIFIED:20260608T093949Z
UID:46374-1781782200-1781802000@gercin.org
SUMMARY:Public Hearing on Discussion Paper
DESCRIPTION:Discussion Paper on Determination of tariff for Procurement of Power by Distribution Licensees and others from Small Hydro Power Projects in the State of Gujarat\, 2026.
URL:https://gercin.org/hearing-schedule/public-hearing-on-discussion-paper-5/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260618T113000
DTEND;TZID=Asia/Kolkata:20260618T170000
DTSTAMP:20260626T061607
CREATED:20260608T094032Z
LAST-MODIFIED:20260608T094032Z
UID:46376-1781782200-1781802000@gercin.org
SUMMARY:Public Hearing on Draft GERC (GIDRES) Regulation\,2026
DESCRIPTION:Draft GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations\, 2026
URL:https://gercin.org/hearing-schedule/public-hearing-on-draft-gerc-gidres-regulation2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260618T113000
DTEND;TZID=Asia/Kolkata:20260618T170000
DTSTAMP:20260626T061607
CREATED:20260608T094105Z
LAST-MODIFIED:20260608T094105Z
UID:46378-1781782200-1781802000@gercin.org
SUMMARY:Public Hearing on Draft GERC (GEGC) Regulation\, 2026
DESCRIPTION:Draft GERC (Gujarat Electricity Grid Code) Regulations\, 2026.
URL:https://gercin.org/hearing-schedule/public-hearing-on-draft-gerc-gegc-regulation-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260619T113000
DTEND;TZID=Asia/Kolkata:20260619T170000
DTSTAMP:20260626T061607
CREATED:20260618T053242Z
LAST-MODIFIED:20260618T053242Z
UID:46477-1781868600-1781888400@gercin.org
SUMMARY:1862/2020
DESCRIPTION:Petition for extension of time limit for erection of the 66kV transmission line for enhancement of the load from 4000 kVA to 7000 kVA.
URL:https://gercin.org/hearing-schedule/1862-2020-10/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260619T113000
DTEND;TZID=Asia/Kolkata:20260619T170000
DTSTAMP:20260626T061607
CREATED:20260618T053519Z
LAST-MODIFIED:20260618T053519Z
UID:46479-1781868600-1781888400@gercin.org
SUMMARY:2530/2025
DESCRIPTION:Petition under Section 61 (h)\, 62\, 86 (1) (c) (d) & 181 of the Electricity Act\, 2003 read with Regulation 19 of the GERC (Net metering Rooftop Solar PV Grid Interactive Systems) Regulations 2016 and other applicable provisions for incorporation of provisions of Virtual Net Metering.
URL:https://gercin.org/hearing-schedule/2530-2025-2/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260619T113000
DTEND;TZID=Asia/Kolkata:20260619T170000
DTSTAMP:20260626T061607
CREATED:20260618T053558Z
LAST-MODIFIED:20260618T053558Z
UID:46481-1781868600-1781888400@gercin.org
SUMMARY:2655/2026 & allied
DESCRIPTION:Petition under Section 86 (1) (f) (c) & (e) and other applicable provisions of the Electricity Act\, 2003 read with read with Regulations 80 & 82 of the GERC (Conduct of Business) Regulations\, 2004 seeking extension of time period for construction of the evacuation infrastructure.
URL:https://gercin.org/hearing-schedule/2655-2026-allied/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260622T113000
DTEND;TZID=Asia/Kolkata:20260622T170000
DTSTAMP:20260626T061607
CREATED:20260616T071719Z
LAST-MODIFIED:20260616T071719Z
UID:46455-1782127800-1782147600@gercin.org
SUMMARY:OMB/RJT/32/2026
DESCRIPTION:Billing related
URL:https://gercin.org/hearing-schedule/omb-rjt-32-2026-2/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260622T113000
DTEND;TZID=Asia/Kolkata:20260622T170000
DTSTAMP:20260626T061607
CREATED:20260617T101457Z
LAST-MODIFIED:20260617T101457Z
UID:46474-1782127800-1782147600@gercin.org
SUMMARY:Public Hearing on Draft GERC (GEOA) (Fifth Amendment) Regulations\, 2026
DESCRIPTION:Draft Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Fifth Amendment) Regulations\, 2026.
URL:https://gercin.org/hearing-schedule/public-hearing-on-draft-gerc-geoa-fifth-amendment-regulations-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260623T113000
DTEND;TZID=Asia/Kolkata:20260623T170000
DTSTAMP:20260626T061607
CREATED:20260611T105724Z
LAST-MODIFIED:20260611T105724Z
UID:46412-1782214200-1782234000@gercin.org
SUMMARY:OMB/RJT/35/2026
DESCRIPTION:Estimate related
URL:https://gercin.org/hearing-schedule/omb-rjt-35-2026/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260624T113000
DTEND;TZID=Asia/Kolkata:20260624T170000
DTSTAMP:20260626T061607
CREATED:20260611T114646Z
LAST-MODIFIED:20260611T114646Z
UID:46422-1782300600-1782320400@gercin.org
SUMMARY:OMB/AHM/9/2026
DESCRIPTION:Representation Admission stage Hearing
URL:https://gercin.org/hearing-schedule/omb-ahm-9-2026/
CATEGORIES:Ombudsman Hearing Schedule Ahmedabad
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260624T120000
DTEND;TZID=Asia/Kolkata:20260624T170000
DTSTAMP:20260626T061607
CREATED:20260615T083044Z
LAST-MODIFIED:20260615T083044Z
UID:46452-1782302400-1782320400@gercin.org
SUMMARY:OMB/AHM/10/2026
DESCRIPTION:New Connection
URL:https://gercin.org/hearing-schedule/omb-ahm-10-2026/
CATEGORIES:Ombudsman Hearing Schedule Ahmedabad
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260625T113000
DTEND;TZID=Asia/Kolkata:20260625T170000
DTSTAMP:20260626T061607
CREATED:20260624T061105Z
LAST-MODIFIED:20260624T061105Z
UID:46573-1782387000-1782406800@gercin.org
SUMMARY:OMB/AHM/9/2026
DESCRIPTION:Representation Admission stage Hearing
URL:https://gercin.org/hearing-schedule/omb-ahm-9-2026-2/
CATEGORIES:Ombudsman Hearing Schedule Ahmedabad
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260623T123054Z
LAST-MODIFIED:20260623T123054Z
UID:46569-1782819000-1782838800@gercin.org
SUMMARY:OMB/RJT/35/2026
DESCRIPTION:Estimate related
URL:https://gercin.org/hearing-schedule/omb-rjt-35-2026-2/
CATEGORIES:Ombudsman Hearing Schedule Rajkot
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260625T085746Z
LAST-MODIFIED:20260625T085746Z
UID:46580-1782819000-1782838800@gercin.org
SUMMARY:1337/2013
DESCRIPTION:Adjudication of disputes under Power Purchase Agreement dated 30.04.2010 and Supplementary Power Purchase Agreements dated 27.10.2010 and 10.05.2011.
URL:https://gercin.org/hearing-schedule/1337-2013-20/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260625T085821Z
LAST-MODIFIED:20260625T085821Z
UID:46582-1782819000-1782838800@gercin.org
SUMMARY:1555/2016
DESCRIPTION:Petition filed under Sections 142 and 146 of Electricity Act\, 2003 due to non-compliance of award issued by the Electricity Ombudsman.
URL:https://gercin.org/hearing-schedule/1555-2016-5/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260625T085855Z
LAST-MODIFIED:20260625T085855Z
UID:46584-1782819000-1782838800@gercin.org
SUMMARY:1875/2020
DESCRIPTION:Petition under Section 50 of EA\, 2003 and Clause 3.3\, 9.21\, 9.22\, 9.23\, 9.24 and 9.25 of GERC (Electricity Supply Code and Related matters) Regulations\, 2015 for approval and necessary direction of Commission with regard to proposal of GIFTPCL for modification in billing and metering arrangement of HTP-I consumers residing in high rise buildings in its area of supply.
URL:https://gercin.org/hearing-schedule/1875-2020-4/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260625T085929Z
LAST-MODIFIED:20260625T085929Z
UID:46586-1782819000-1782838800@gercin.org
SUMMARY:2601/2026
DESCRIPTION:Petition seeking for approval of adoption of tariff discovered through transparent reverse bidding process under Section 63 of the Electricity Act\, 2003\, with Rs. 2.95 per unit as ceiling tariff in continuation to the Commission’s Order dated 06.05.2025 in Petition No. 2247 of 2023\, filed under Section 86 and other applicable provisions of the Electricity Act\, 2003 for approval of prefixed levelized tariff for purchase of power from Decentralize Ground / Stilt Mounted Grid Connected Solar / other RE based power plants under Component-A of the PM-KUSUM scheme as per Government of Gujarat GR No. SLR/11 /2020/mini-185/BI Dated 11.12.2020 a GR No. SLR/e-file/20/2022/BI Dated 30.01.2023.
URL:https://gercin.org/hearing-schedule/2601-2026-4/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260630T113000
DTEND;TZID=Asia/Kolkata:20260630T170000
DTSTAMP:20260626T061607
CREATED:20260625T090004Z
LAST-MODIFIED:20260625T090004Z
UID:46588-1782819000-1782838800@gercin.org
SUMMARY:2602/2026
DESCRIPTION:Petition seeking for approval of adoption of tariff discovered through transparent reverse bidding process under Section 63 of the Electricity Act\, 2003\, with Rs. 2.95 per unit as ceiling tariff in continuation to the Commission’s Order dated 06.05.2025 in Petition No. 2247 of 2023\, filed under Section 86 and other applicable provisions of the Electricity Act\, 2003 for approval of prefixed levelized tariff for purchase of power from Decentralize Ground / Stilt Mounted Grid Connected Solar / other RE based power plants under Component-A of the PM-KUSUM scheme as per Government of Gujarat GR No. SLR/11 /2020/mini-185/BI Dated 11.12.2020 a GR No. SLR/e-file/20/2022/BI Dated 30.01.2023.
URL:https://gercin.org/hearing-schedule/2602-2026-4/
CATEGORIES:Hearing Schedule
END:VEVENT