        BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Gujarat Electricity Regulatory Commission - ECPv5.3.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Gujarat Electricity Regulatory Commission
X-ORIGINAL-URL:https://gercin.org
X-WR-CALDESC:Events for Gujarat Electricity Regulatory Commission
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
TZOFFSETFROM:+0530
TZOFFSETTO:+0530
TZNAME:IST
DTSTART:20260101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260324T132228Z
LAST-MODIFIED:20260324T132228Z
UID:45350-1774870200-1774890000@gercin.org
SUMMARY:Public Hearing on Draft GERC (Terms and Conditions for Green Energy Open Access) (Fourth Amendment) Regulations\, 2026
DESCRIPTION:In the matter of Draft GERC (Terms and Conditions for Green Energy Open Access) (Fourth Amendment) Regulations\, 2026
URL:https://gercin.org/hearing-schedule/public-hearing-on-draft-gerc-terms-and-conditions-for-green-energy-open-access-fourth-amendment-regulations-2026/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105110Z
LAST-MODIFIED:20260325T105110Z
UID:45356-1774870200-1774890000@gercin.org
SUMMARY:2266/2023
DESCRIPTION:Petition under Section 86 of EA\, 2003 read with Clause 16 of the Procedure for ‘Grant of Connectivity to projects based on Renewable Sources to Intra-State Transmission System’ approved by the Commission on 07.01.2023 and Connection Agreement dated 24.07.2023 executed between Enfinity Global Surya Vayu Energy Pvt. Ltd.\, and GETCO\, seeking to quash and set aside the Letter dated 16.09.2023 issued by GETCO and for directions to restore the Stage-II Connectivity dated 31.05.2023 granted to Petitioner.
URL:https://gercin.org/hearing-schedule/2266-2023/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105217Z
LAST-MODIFIED:20260325T105217Z
UID:45358-1774870200-1774890000@gercin.org
SUMMARY:2530/2025
DESCRIPTION:Petition under Section 61 (h)\, 62\, 86 (1) (c) (d) & 181 of the Electricity Act\, 2003 read with Regulation 19 of the GERC (Net metering Rooftop Solar PV Grid Interactive Systems) Regulations 2016 and other applicable provisions for incorporation of provisions of Virtual Net Metering.
URL:https://gercin.org/hearing-schedule/2530-2025/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105316Z
LAST-MODIFIED:20260325T105316Z
UID:45360-1774870200-1774890000@gercin.org
SUMMARY:2534/2025
DESCRIPTION:Petition under provisions of Regulation 6.2 of GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations\, 2016\, seeking for Order to relax the Regulation 6.2 and permit the Petitioner to increase Rooftop Solar Power Generation Plant to 3 MW (DC) at its Unit in SEZ II\, Dahej.
URL:https://gercin.org/hearing-schedule/2534-2025/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105404Z
LAST-MODIFIED:20260325T105404Z
UID:45362-1774870200-1774890000@gercin.org
SUMMARY:2539/2025 & allied IA
DESCRIPTION:Petition under Section 86 (1) (c) (e)\, (f) and other applicable provisions of the Electricity Act\, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations 2004 seeking extension of time period for construction of the evacuation infrastructure and quashing of the letter dated 07.07.2025 issued at the behest of the Respondent GETCO.
URL:https://gercin.org/hearing-schedule/2539-2025-allied-ia/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105449Z
LAST-MODIFIED:20260325T105449Z
UID:45364-1774870200-1774890000@gercin.org
SUMMARY:2541/2025
DESCRIPTION:Petition under Section 86 (1) (f) and Section 56 (2) of the Electricity Act\, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations 2004 and alleged demand of payment of POC for 5562.5 KVA CPP of Shree Ajit Pulp and Paper Limited and Show Cause Notice dated 19.02.2025 and disconnection Notice dated 17.03.2025 of DGVCL.
URL:https://gercin.org/hearing-schedule/2541-2025/
CATEGORIES:Hearing Schedule
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260426T150046
CREATED:20260325T105531Z
LAST-MODIFIED:20260325T105531Z
UID:45366-1774870200-1774890000@gercin.org
SUMMARY:2543/2025 & allied IA
DESCRIPTION:Petition under Section 86 (1) (e) of EA\, 2003 read with Regulations 10.1 of the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations 2016 as amended from time to time read with regulations 61\, 80\, 52 of the GERC (Conduct of Business) Regulations\, 2004 seeking a direction to set aside the arbitrary\, illegal and unreasonable interpretation accorded by the Respondent to regulation 16.3 of the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations 2022 and consequently set aside the letter dated 21.08.2025 issued by the Respondent to the Petitioner demanding an additional electricity charges from the Petitioner.
URL:https://gercin.org/hearing-schedule/2543-2025-allied-ia/
CATEGORIES:Hearing Schedule
END:VEVENT
END:VCALENDAR