        BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Gujarat Electricity Regulatory Commission - ECPv5.3.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Gujarat Electricity Regulatory Commission
X-ORIGINAL-URL:https://gercin.org
X-WR-CALDESC:Events for Gujarat Electricity Regulatory Commission
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
TZOFFSETFROM:+0530
TZOFFSETTO:+0530
TZNAME:IST
DTSTART:20260101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20260330T113000
DTEND;TZID=Asia/Kolkata:20260330T170000
DTSTAMP:20260406T030623
CREATED:20260325T105531Z
LAST-MODIFIED:20260325T105531Z
UID:45366-1774870200-1774890000@gercin.org
SUMMARY:2543/2025 & allied IA
DESCRIPTION:Petition under Section 86 (1) (e) of EA\, 2003 read with Regulations 10.1 of the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations 2016 as amended from time to time read with regulations 61\, 80\, 52 of the GERC (Conduct of Business) Regulations\, 2004 seeking a direction to set aside the arbitrary\, illegal and unreasonable interpretation accorded by the Respondent to regulation 16.3 of the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations 2022 and consequently set aside the letter dated 21.08.2025 issued by the Respondent to the Petitioner demanding an additional electricity charges from the Petitioner.
URL:https://gercin.org/hearing-schedule/2543-2025-allied-ia/
CATEGORIES:Hearing Schedule
END:VEVENT
END:VCALENDAR