        BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Gujarat Electricity Regulatory Commission - ECPv5.3.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Gujarat Electricity Regulatory Commission
X-ORIGINAL-URL:https://gercin.org
X-WR-CALDESC:Events for Gujarat Electricity Regulatory Commission
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
TZOFFSETFROM:+0530
TZOFFSETTO:+0530
TZNAME:IST
DTSTART:20220101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20220517T123000
DTEND;TZID=Asia/Kolkata:20220517T170000
DTSTAMP:20260508T214044
CREATED:20220511T071334Z
LAST-MODIFIED:20220511T071334Z
UID:30565-1652790600-1652806800@gercin.org
SUMMARY:1601/2016 with IA No. 11 /2020
DESCRIPTION:Petition under Section 86(1)(f) of the Electricity Act\, 2003 and seeking adjudication of the dispute in respect of non-applicability of levy of Cross Subsidy Surcharge in terms of Section 38(2)(d)(ii) and 42 (2) of the Electricity Act\, 2003 read with the provisions of the National Electricity Policy and Tariff Policy and provisions of GERC (Terms and Conditions of Intra-State Open Access) Regulations\, 2011 and GERC (MYT) Regulations\, 2011 and GERC (MYT) Regulations\, 2016.
URL:https://gercin.org/hearing-schedule/1601-2016-with-ia-no-11-2020/
CATEGORIES:Hearing Schedule
END:VEVENT
END:VCALENDAR