Petition No.

Order Date

Petitioner/Respondent

Matter

889/2006

07/01/2008

Shri Navin Jobanputra.

Executive Director,

Surendranagar Vikas Sansthan

 

V/S

 

PGVCL, MGVCL, UGVCL, DGVCL, GUVNL, The Chief Secretary, Govt. of Gujarat,

Sachivalaya, Gandhinagar.

 

In the matter of:Regularizing additional load demand in respect of agricultural consumers.

809/2004

09/01/2008

Essar Steel Limited.

Post Hazira, Dist: Surat.

 

V/s

 

GUNNL, GETCO & DGVCL

In the matter of: Petition under section 39(2)(d)(ii), 42(2) and 86(c) of the Electricity Act,2003 for permission for use of the Transmission network from Kawas sub-station of Powergrid to the petitioners plant at Hazira and for fixing transmission charges and surcharges between Kawas and Hazira.

 

902/2007

26/03/2008

 

Nirma Limited, Nirma House, Ashram Road, Ahmedabad.

 

V/S

 

Gujarat Energy Transmission Corporation Ltd.

Vadodara.

 

In the matter of: Objection against the levy and demand for transmission charges and representation for cancellation of transmission charges.

 

910/2007

22/01/2008

Union Territory of Dadra and Nagar Haveli

V/S

GUVNL, GETCO, Madhya Pradesh Power Trading Co. Ltd, Maharashtra State Distribution Co. Limited, Chhattisgarh State Electricity Board, Electricity Department, Govt. of Goa, Power Grid Corporation of India Limited (PGCIL), The Member Secretary Western Regional Power Committee (WRPC), The Executive Engineer Electricity Department

 

 

In the matter of: Determination of Transmission charges of Gujarat Transmission System (GETCO) being used incidental to transmission system of Central Transmission Utility (CTU) for transmission of Central Sector power to Union Territory of Dadra Nagar Haveli.

918/2007

26/03/2008

Consumer Education and Research Society,

Thaltej, Ahmedabad.

 

Co-Petitioner : Surendranagar District Industries Association, Wadhwancity, Dist: Surendranagar.

V/S

GUVNL, PGVCL, UGVCL, MGVCL, & DGVCL

In the matter of : State owned Distribution companies arbitrarily collecting reconnection charges from residential, commercial, industrial, agricultural and other consumers without physical disconnection of power for unjust enrichment.

 

 

919/2007

 

29/01/2008

M/s. Ind-Barath Power Infra Pvt Limited (IBPIL)

V/S

GUNVL Vadodra, GETC Vadodra, PGVCL, GEDA

In the matter of: Approval for tariff for the proposed 2 Numbers of 20 MW each Biomass based power plants in Kutch and Patan Districts in the state of Gujarat.

 

920/2007

 

29/01/2008

M/s. Patel Power

V/S

Gujarat Urja Vikas Nigam limited,

Race Course, Vadodara

 

In the matter of: Determination of Tariff under the Clause-A of sub-section (1) of Section 62 of Electricity Act from Biomass Based direct Combustion Power Plants.

 

923/2007

29/03/2008

 

GUNVL

 

V/S

 

Gujarat Industries Power Company Ltd.

 

In the matter of: Revision of Station Heat Rate approved for PPA governed GIPCL’s 160 MW Combined Cycle Power Station –II at Baroda.

924/2007

28/03/2008

SELCO INTERNATIONAL LTD.

 

V/S

 

Ahmedabad Municipal Corporation, Torrent Power Ltd., Ahmedabad, Gujarat Urja Vikas Nigam Ltd., Vadodara.

 

In the matter of: Fixation of tariff and the issue of guidelines for the purchase ofElectricity generated from Municipal Solid Waste based projects in theState of Gujarat.

 

911/2007

14/02/2008

Union Territories of Daman and Diu, (DD) Electricity Department

 

V/S

 

GUVNL, GETCO, Madhya Pradesh Power Trading Co. Ltd.,

Maharashtra State Distribution Co. Limited, Chhattisgarh State Electricity Board, Electricity Department, Govt. of Goa, Power Grid Corporation of India Limited (PGCIL) WRHQ, The Member Secretary Western Regional Power Committee (WPRC), The Executive Engineer Electricity Department, Silvassa-396230.

 

In the matter of:Determination of Transmission charges of Gujarat Transmission System(GETCO) being used incidental to transmission system of Central TransmissionUtility (CTU) for transmission of Central Sector power to Union Territory ofDaman and Diu u/s 86 of the Electricity Act,2003.

 

929/2007

14/02/2008

Phillips Carbon Black Limited,

N.H.No.8, Palej, 392 220, Dist: Bharuch.

 

V/S

 

State Load Despatch Centre, Gotri,

Gujarat Energy Transmission Corporation, Vadodara

 

 

In the matter of:Review Application under Regulation 72(1) of Gujarat ElectricityRegulatory Commission (Conduct of Business) Regulations,2004 forreview of the Order No.3 dated 11th August,2006 passed by GERC.

 

912/2007

14/03/2008

Gujarat Krushi Vij Grahak Suraksha Sangh ( GKVGSS )

 

V/S

 

GUVNL,  UGVCL, PGVCL, MGVCL, DGVCL, Government of Gujarat, Energy & Petrochemicals  Department, Gandhinagar.

 

 

In the matter of:Further rebundling of Electricity Distribution Companies and to establish Gujarat Rural Area Vij Company / Board / Corporation.

922/2007

14/03/2008

Gujarat State Electricity Corporation Ltd.

 

V/S

 

Gujarat Urja Vikas Nigam Ltd., Vadodara, Consumer Education & Research Society, Ahmedabad.

 

 

 

In the matter of: Revision of Station Heat Rate approved for PPA governed Station of Utran GBPS-1

61/2007

26/03/2008

Deputy Engineer (O&M),

Udhyognagar Sub Division,

Paschim Gujarat Vij Company Ltd. (PGVCL)

Bhaktinagar GIDC, Rajkot.

 

V/S

 

Bharatbhai Odhavjibhai Vekaria, Rajkot, Electrical Inspector, Rajkot

 

 

In the matter of: Appeal against the order of Electrical Inspector, Rajkot.

 

930/2007

 

29/03/2008

Gujarat Energy Transmission Corpn Ltd. (GETCO)

Race Course, Vadodara.

 

V/S

 

Gujarat Alkalies & Chemicals Ltd., Po.Petrochemicals, Vadodara.

 

 

In the matter of: Approval of Compensation under exit option of Open Access regulations in case of reduction in Wheeling Demand from 30 MW to 12 MW.

 

 

66/2002

 

23/05/2008

United Phosphorous Ltd (Search Chem Industries Ltd.)750, GIDC, Post Box No.9,

Jhagadia-393 110, Dist: Bharuch

 

V/S

 1)     Gujarat Urja Vikas Nigam Ltd. Vadodara..

2) Dakshin Gujarat Vij Company Ltd.,Surat.

In the matter of: For setting aside penalty of Rs.62,64,008/- deducted by the respondent from power supply bills for alleged failure of the petitioner to supply reactive power at 0.8 power factor or less

 

932/2008

 

22/05/2008

 

Dakshin Gujarat Vij Co. Ltd.

Surat

 
V/S

 

Western Railway, Valsad

 

 

In the matter of clarification of condition under para 15.1 of the tariff schedule of the tariff order dated 25.6.2004